Haynes Manuals Presents Project 50. A full restoration of a 1965 Ford Mustang Convertible.

Haynes

Haynes is celebrating its 50th birthday in a very unique and exciting way! This restoration will take a stock Mustang from "barn find" condition to "show car ready" in time for AAPEX/SEMA in 2011. "Project 50" is a DIY car enthusiasts' dream come to reality through the work of Haynes own employees who are DIY enthusiasts. These Haynes employees are the same people who do the teardowns, research, photograph and write Haynes repair manuals. Follow along with the restoration progress through the Live Mustang Cam during business hours or through the Video logs. Join Haynes in the celebration of 50 Years of Do-It-Yourself Automotive excellence with "Project 50"!

Live Mustang garage cam

1965 Ford Mustang convertible with a 289 V8 engine and C4 automatic transmission. The vehicle will be restored back to the original body color of Twilight Turquoise metallic and an interior style of D6 White Crinkle Vinyl with black appointments.

Project 50 Blog

Haynes Project 50 Blog is an area where you can speak directly to the Haynes team that is working on the Mustang restoration. You can ask them questions or leave them comments about the project. The Haynes team will be announcing news and coming events in the blog to keep you updated on the restoration schedule. As is usually the case with a project such as this, there will be some bumps in the road to the fully restored '65 Mustang convertible. So, follow along with Haynes' progress and you can be part of the team!

Tuesday, June 21, 2011

Project 50 Activities for the weeks of June 20 and 27th

Project 50 Fans--
Our activities on the Haynes Project 50 Mustang Restoration will be the following over the next two weeks:
  • Install the radiator
  • Install the exhaust system
  • Rebuild the shifter
  • Clean-up and rebuild the driveshaft
  • Install the headlights
  • Install the transmission cooler lines
We hope you will continue to follow along with our progress as we go into the final stretch towards the 2011 AAPEX/SEMA show where our completed '65 Mustang will be shown.
Sincerely, the Haynes Project 50 Team

Thursday, June 2, 2011

Haynes Project 50 Update: Weeks of June 6 and 13th

Hello to our Haynes Site Visitors!

Here are our Project 50 activities over the next two weeks:

  1. Install the engine and transmission

  2. Install the window frames and glass

  3. Install weatherstripping

  4. Finish interior re-upholstery


You can ask the Project 50 Team any questions about the restoration. These are the actual guys doing the work!
Best, Haynes Project 50 Team

Friday, May 13, 2011

Haynes Project 50 Updates for the weeks of May 16th and 23rd

A Project 50 Update on our activities over the next two weeks:
  • Assembling the dash
  • Assembling the interior
  • Installing the glass
  • Preparing the engine compartment for engine installation
Please see our new video of our restoration work found above. And, be sure to check out the Mustang Live Garage Cam during business hours to see us work live! Leave us a question or comment please! Best, the Project 50 Team

Monday, April 18, 2011

Haynes Project 50 Update for the weeks of April 18th and 25th

Hello Project 50 Fans:
Over the next two weeks, we'll tackle the following in our restoration of a '65 Mustang convertible in time for the SEMA/AAPEX 2011 Show in Vegas:
  • Upholstering the seats
  • Assembling the exterior trim and emblems
  • Installing the rear lighting
Be sure to take a look at our videos of the restoration work. And, watch the live garage cam during business hours to see our work first hand.
The Haynes Project 50 Team

Wednesday, April 6, 2011

Haynes Project 50 Update for the weeks of April 4th and 11th

The Haynes Project 50 Team will be working on the following over the next two weeks:
  • Finishing details on the under-chassis ( brake lines, fuel lines, cables, etc)
  • Making the brake system functional
  • Reassembling the dash
  • Upholstering the seats
Be sure to watch us live on the Mustang Garage Cam above! Thanks for visiting, the Haynes Team

Monday, March 21, 2011

Haynes Project 50 Update for the weeks of March 21st and 28th

Thanks for visiting the Haynes Project 50 Blog! Here's a summary of the Project 50 Team activities over the next two weeks:

1. Final assembly of the suspension and steering system to the car

2. Final assembly of the transmission

3. Beginning interior reassembly

Be sure to take a look at the Mustang Live Garage Camera to watch the restoration work live during business hours. Ask us any question or leave us a comment about the work. Till next time, the Haynes P50 Team

Wednesday, March 2, 2011

Haynes Project 50 Update for the weeks of March 7th and 14th

Hello from the Haynes Project 50 Team! Over the next two weeks, we'll be working on the following as we restore a '65 Mustang convertible in time for the 2011 SEMA/AAPEX show:

1. The interior quarter trim panels and steering column shroud are being stripped and repainted.

2. The steering gearbox is being cleaned and resealed.

3. The front suspension components are being refinished and re-bushed.

4. The rebuilt engine is receiving its final touches: Wire-wheel and refinish the exhaust manifolds, install the new water pump and drive in the new freeze plugs.

Let us know if you have any questions and watch us live on the Mustang Garage Cam!